Material of Side Sealing block: RTSi5
Technical of erection note:
Concrete should be filled in after chain grate commissiong and normal operation,
after left and right clamps should be discharged 2 to 3 pieces, meanwhile both sides sealing
blocks filled and auto adjustment during following 3 to 4 weeks of chain grate continous operation;
2. The side sealing space can be adjusted during block installation;
Material of Side Sealing block: RTSi5
Technical of erection note:
Concrete should be filled in after chain grate commissiong and normal operation,
after left and right clamps should be discharged 2 to 3 pieces, meanwhile both sides sealing
blocks filled and auto adjustment during following 3 to 4 weeks of chain grate continous operation;
2. The side sealing space can be adjusted during block installation;